Welcome to Wuxi high-tech ultra thin stone material Co.,Ltd.  
简体中文 | ENGLISH
 
About us
Qualification certificate
Production equipment
Installation drawing
Contact us
 
Wuxi high-tech ultra thin stone material Co.,Ltd.
Address: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668
Fax: 86-510-83922778
Contact: Mr Du
Mobile phone: 86-18115395629
QQ:905979741
Zip code: 214194
Email: 905979741@QQ.com
 
 
- News and information
 
Honeycomb stone installation method
Update time: 2022/3/28 8:06:49    Clicks: 640    

Installation method of honeycomb stone: 1. Lug type: this installation method is to separate the lifting lug from the honeycomb plate. The lifting lug is separately processed and connected with the bonding joint of honeycomb plate. The appropriate width of adhesive joint is ≥ 12mm. This installation method makes the processing simple and the installation convenient. 2. Flanging type: this installation method is to install flanging when processing aluminum honeycomb panel. The installation only needs to be comfortably connected with the keel and glue seam. The appropriate bonding width is ≥ 10mm. This method is easy to install, but the processing is slightly complex, so it is not suitable for modeling curtain wall panels. 3. Buckle type: the node is aluminum buckle rod type, and the buckle rod is a specific profile, which is simple to install. However, this method requires high processing accuracy of plates and is not recommended for plates with a length of more than 3000mm. According to the buckle width, the middle seam of the plate is 20mm and 40mm respectively. Specific construction steps of honeycomb stone: 1. The vertical keel of the stone gate shall be positioned and set out. The keel installation elevation deviation shall not be greater than 3mm, the front and rear deviation of the axis shall not be greater than 2mm, and the left and right deviation shall not be greater than 3mm. 2. The vertical steel keel is welded with the steel structure, and the weld height is 6mm. The weld shall be free of false welding, slag inclusion and shrinkage cavity, and the undercut shall be less than 0.5mm. 3. The steel corner code and the vertical keel are connected with stainless steel bolts and loosened with spring washers. Adjust the position of the angle code. The front and rear deviation of the axis shall not be greater than 1mm. Tighten the bolts after adjustment. 4. After the keel is installed and adjusted, the surface shall be evenly sprayed with fluorocarbon. 5. The aluminum alloy beam and the corner code are connected by stainless steel bolts, and the spring gasket is relaxed. The beam shall be horizontal, and the horizontal elevation deviation of two adjacent beams shall not be greater than 1mm. Elevation deviation of the same floor: not more than 5mm when the curtain wall width is less than or equal to 35m, and not more than 7mm when the curtain wall width is greater than 35m. (1) The distance between the two rear bolts and both ends of the stone shall not be less than 3 times the thickness of the stone, and shall not be less than 85mm, but not more than 180mm. (2) There shall be no damage or crack after opening, and the hole shall be smooth and clean. (3) On site installation of back bolt: before the installation of back bolt, pay attention to remove the stone chips in the hole and check whether the position and size of the hole are correct. When installing the rear bolt, gently tap the slow hammer to avoid damaging the stones. (4) On site installation of louver wire hanger: the hanger and louver wire are connected with back bolts. Before installing the pendant, pay attention to check whether the surface of the rear bolt anchor screw is flush with the line surface. When installing the pendant, pay attention to check whether both ends of the pendant are flush. (5) Before installing the stone louver line, be familiar with the drawings, confirm the installation position and number of lines with different sizes. (6) Install louver lines at both ends of the large surface. Pull the louver lines along the horizontal direction of the two louver lines to control the smoothness and levelness of the louver. When installing vertically, pull the louver lines to control the smoothness and verticality.
Total:1 pages  page: 1  

Previous:Construction process flow of stone honeycomb plate   Next:How much thickness is suitable for producing decorative stone honeycomb aluminum plate?
Add: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668  Fax: 86-510-83922778
Contact: Mr.Du  Phone: 86-18115395629  QQ:905979741  Zip code:214194 
E-mail:905979741@qq.com Web:http://www.gkcbsc.com
 
All rights reserved: Wuxi high-tech ultra thin stone material Co.,Ltd.