Welcome to Wuxi high-tech ultra thin stone material Co.,Ltd.  
简体中文 | ENGLISH
 
About us
Qualification certificate
Production equipment
Installation drawing
Contact us
 
Wuxi high-tech ultra thin stone material Co.,Ltd.
Address: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668
Fax: 86-510-83922778
Contact: Mr Du
Mobile phone: 86-18115395629
QQ:905979741
Zip code: 214194
Email: 905979741@QQ.com
 
 
- News and information
 
Construction process flow of stone honeycomb plate
Update time: 2022/4/16 14:30:27    Clicks: 639    

Construction process flow of stone honeycomb plate: 1. Surveying and setting out: 1. According to the detailed drawing of stone curtain wall division and the position of elevation point, access line and axis given by the civil engineering unit, set the datum lines of stone curtain wall plane, column, division and corner on the main body with heavy hammer, steel wire, measuring instrument and level, and adjust and retest with theodolite. 2. The measurement and setting out of the grid axis of the stone curtain wall shall cooperate with the measurement and setting out of the main structure, and the horizontal elevation shall be led up layer by layer from the ground to avoid error accumulation. If the error is greater than the specified allowable deviation, it shall be approved by the supervisor and designer, and the axis of stone curtain wall shall be adjusted appropriately to meet the structural needs of stone curtain wall. 3. The measurement of high-rise buildings shall be carried out under the condition that the wind force is not greater than level 4. 4. When measuring and setting out, check and locate the position deviation of embedded parts. The upper, lower, left and right deviation shall not exceed 30mm. However, the stone curtain wall is connected with the main body without embedded parts, so it is necessary to supplement the production and installation of embedded parts. 210mm thick steel plate and 4-12 chemical anchor bolts are used for column embedded parts. Nuts and bolts are spot welded to prevent loosening. Anti corrosion treatment is carried out after spot welding.
Total:1 pages  page: 1  

Previous:Characteristics of honeycomb stone   Next:Honeycomb stone installation method
Add: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668  Fax: 86-510-83922778
Contact: Mr.Du  Phone: 86-18115395629  QQ:905979741  Zip code:214194 
E-mail:905979741@qq.com Web:http://www.gkcbsc.com
 
All rights reserved: Wuxi high-tech ultra thin stone material Co.,Ltd.