Welcome to Wuxi high-tech ultra thin stone material Co.,Ltd.  
简体中文 | ENGLISH
 
About us
Qualification certificate
Production equipment
Installation drawing
Contact us
 
Wuxi high-tech ultra thin stone material Co.,Ltd.
Address: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668
Fax: 86-510-83922778
Contact: Mr Du
Mobile phone: 86-18115395629
QQ:905979741
Zip code: 214194
Email: 905979741@QQ.com
 
 
- News and information
 
What are the installation methods of stone aluminum honeycomb plate?
Update time: 2022/8/18 10:34:51    Clicks: 550    

Installation method of stone aluminum honeycomb plate: 1. Lifting lug type: the installation method is to separate the lifting lug from the honeycomb plate. After the lifting lug is treated separately, the adhesive part is connected with the honeycomb plate, and the appropriate width of the adhesive part is ≥ 12mm. The installation method makes the processing simple and the installation convenient. 2. Flanging type: the installation method is processing aluminum honeycomb plate, i.e. processing installation flange. The installation only needs to be connected with the keel and glue. The width of glue joint should be about 10mm. This method is simple to install, but the process is a little complicated, which is not suitable for modeling of curtain wall panels. 3. Buckle type: the node is aluminum buckle, which is convenient for installation after deducting specific configuration files. However, this method requires high processing accuracy of metal plates and is not recommended for plates with a length of more than 3000 mm. Specific construction steps of stone honeycomb plate such as buckle width, 20 mm and 40 mm plate stitching: 1 the stone louver shall be perpendicular to the keel positioning and release line. The keel installation elevation deviation shall not be greater than 3mm, the axial front back deviation shall not be greater than 2mm, and the left and right deviation shall not be greater than 3mm. 2. The vertical steel keel is welded with the steel structure, with the weld height of 6mm, no false welding and slag inclusion, and the undercut is less than 0.5mm. 3. Angle steel and vertical keel are connected by stainless steel bolts. The spring washer is used for relaxation. Adjust the position of the angle code. The front and rear deviation of the axis shall not be greater than 1mm. Tighten the bolts after adjustment. 4. The aluminum alloy beam and the corner bar are connected with stainless steel bolts, and the spring washers are loose. The beam shall be horizontal, and the horizontal elevation deviation of two adjacent beams shall not be greater than 1mm. Elevation deviation of the same floor: when the width of curtain wall is less than or equal to 35m, it shall not be greater than 5mm; when the width of curtain wall is greater than 35m, it shall not be greater than 7mm.
Total:1 pages  page: 1  

Previous:No News   Next:What are the characteristics of stone honeycomb plate?
Add: No.9, Jinghua road, Industrial park,Xibei Town, Xishan district, Wuxi
Tel: 86-510-83922668  Fax: 86-510-83922778
Contact: Mr.Du  Phone: 86-18115395629  QQ:905979741  Zip code:214194 
E-mail:905979741@qq.com Web:http://www.gkcbsc.com
 
All rights reserved: Wuxi high-tech ultra thin stone material Co.,Ltd.